OVERVIEW



I.    Scope Engineering

     A.   Mooring Analysis

  •        Mooring strength analysis (Perliminary & Permanent) approved  by IACS Member
  •       Umbilical/Floating Hose strength analysis
  •       Transportation analysis of Mooring Chain and Anchor





B.  Procedure
  •            Project Execution Plan
  •       Anchor installation & Mooring hook-up procedure           
  •       Station keeping/approaching of FPSO/ FSO/FPU/FSRU Procedure    
  •       Umbilical/Floating Hose Installation Procedure


II.  Construction / Installation

  1.    Pre-Construction Survey.

  2.  Marking Coordinate FPSO/ FPU/FSRU as per mooring analysis

  3.  Marking buoy for coordinate mooring chain as per mooring analysis

  4.  Deploy and installation mooring chain, anchor, joining shackle. Then Drag test for all anchor/pile/suction pile.




EXPERIENCE :

  •  MOORING CHAIN INSTALLATION & HOOK UP OF FSO FEDERAL II - CNOOC Ses Ltd
  •  MOORING CHAIN INSTALLATION & HOOK UP OF FSO LENTERA BANGSA - CNOOC Ses Ltd
  •  UNMOORING OF FSO MAXUS WIDURI - CNOOC Ses Ltd

COPYRIGHT © 2020 PT AQUAMARINE DIVINDO INSPECTION