OVERVIEW




Pertamina Hulu Energi West Madura Offshore (PHEWMO) the operator of the West Madura and Poleng assets located in Offshore East Java plans to replace the existing SPM at Poleng Field. The temporary mooring, floating hose and storage tanker are required in order to avoid lost of production due to shutdown. During this temporary loading operation, Re-arrangement of new SPM and new submarine hose will be installed.

The existing SPM is planned to be replaced in Poleng Field to which FSO Abherka will be moored. Besides being meaning a means of mooring, these  SPM  functions  also as offloading and exporting the whole PHE WMO oil production. SPM Replacement is a critical work and its offshore execution needs to be prepared and planned carefully.

PT. AQUAMARINE DIVINDO INSPECTION has Awarded from PHEWMO to execute OFFSHORE SERVICE FOR SPM REPLACEMENT project at September 2013 - November 2013.

SPM Offshore Installation with scope of work will cover the following main items:

  • Perform Pre-Construction Survey
  • Installation Temporary Mooring Buoys and Setting up Temporary Storage Tanker
  • Replacement Existing SPM Including Spool Installation at Exist
  • SBM / SPM Installation
  • Installation Subsea hose & Floating Hose
  • Commissioning and Start Up


PT AQUAMARINE DIVINDO INSPECTION also has finished SPM Replacement for the other Oil & Gas Field Project.


EXPERIENCE :

  1. Offshore Service for SPM Replacement  - PT PHE WMO
  2. SPM 1043 Replacement Services - CNOOC Ses Ltd
  3. SPM 1039 Replacement Services - CNOOC ses Ltd