OVERVIEW
Pertamina Hulu Energi West Madura Offshore (PHEWMO) the operator of the West Madura and
Poleng assets located in Offshore East Java plans to replace the
existing SPM at Poleng Field. The temporary
mooring, floating hose and storage tanker are required in
order to avoid lost of production due to shutdown. During this temporary
loading operation, Re-arrangement of new SPM and new submarine hose will be installed.
The existing SPM is planned to be replaced in Poleng Field to which FSO Abherka will be moored. Besides being meaning a means of mooring, these SPM functions also as offloading and exporting the whole PHE WMO oil production. SPM Replacement is a critical work and its offshore execution needs to be prepared and planned carefully.
PT. AQUAMARINE DIVINDO INSPECTION has Awarded from PHEWMO to execute OFFSHORE SERVICE FOR SPM REPLACEMENT project at September 2013 - November 2013.
SPM Offshore
Installation with scope of work will cover the following main items:
PT AQUAMARINE DIVINDO INSPECTION also has finished SPM Replacement for the other Oil &
Gas Field Project.
EXPERIENCE :